Hollenbeck Park Adjacent and I-5 Fwy Adjacent Beautification Project

This project, located in Boyle Heights, adjacent to Hollenbeck Park and the I-5 Freeway, will beautify and improve safety in the public right-of-way adjacent to Hollenbeck Park, as well as areas inside the park.

 

Project Elements:

  1. 200 new trees, adjacent to and inside the park
  2. 45 pedestrian lights along 4th St, St Louis St, Hollenbeck Dr, and Cummings St
  3. Installation of 6 ADA curb ramps
  4. Reconstruction of 8 driveways
  5. 14,200 SF of new sidewalk along St. Louis St and Hollenbeck Dr (between St Louis and Boyle)
  6. Updating of existing gateway monument
  7. 805 LF of decorative fencing, west side of the park along Cummings St
Schedule:

Construction:
Estimated completion in summer 2024

Budget:

$4.9 million in grant funding from Clean California

image
image 2

Project Overview:

  • Funded by Clean California Grant for $4,993,180
  • Accessibility Improvements
  • Safety Improvements
  • Environmental Improvements
  • Beautify the Area

 

Milestones:

  • Pre‐Design: Spring 2022
  • Design: Summer 2022 – Winter 2023
  • Construction: Winter 2023 – Summer 2024