Hollenbeck project proposed street improvements
Hollenbeck project proposed street improvements
Hollenbeck project proposed street improvements

Hollenbeck Park Adjacent and I-5 Fwy Adjacent Beautification Project

This project, located in Boyle Heights, adjacent to Hollenbeck Park and the I-5 Freeway, will beautify and improve safety in the public right-of-way adjacent to Hollenbeck Park, as well as areas inside the park.

Project Elements:

  • 200 new trees, adjacent to and inside the park
  • 59 pedestrian lights along 4th St, St Louis St, Hollenbeck Dr, and Cummings St
  • Installation of 6 ADA curb ramps
  • Reconstruction of 8 driveways
  • 14,900 SF of new sidewalk along St. Louis St and Hollenbeck Dr (between St Louis and Boyle)
  • Updating of existing gateway monument
  • 805 LF of decorative fencing, west side of the park along Cummings St
Schedule:

Construction:
Estimated completion in summer 2025

Budget:

$4.9 million in grant funding from Clean California Grant

image
image 2

Project Overview:

  • Funded by Clean California Grant for $4,993,180
  • Accessibility Improvements
  • Safety Improvements
  • Environmental Improvements
  • Beautify the Area

 

Milestones:

  • Pre‐Design: Spring 2022
  • Design: Summer 2022 – Winter 2023
  • Construction: Winter 2023 – Summer 2025